Merrimac SHS
![mode-design-merrimac_00.jpg](https://images.squarespace-cdn.com/content/v1/5c6b4f43f4755a314a416ff8/1553566527835-6WBUS7TZJHKHML2VWZBA/mode-design-merrimac_00.jpg)
![mode-design-merrimac_06.jpg](https://images.squarespace-cdn.com/content/v1/5c6b4f43f4755a314a416ff8/1553566627661-BEDVXT12EVMIPJDS24M6/mode-design-merrimac_06.jpg)
![mode-design-merrimac_08.jpg](https://images.squarespace-cdn.com/content/v1/5c6b4f43f4755a314a416ff8/1553566706184-HKYJL9NHO5V5U1ULFZ28/mode-design-merrimac_08.jpg)
This new facility was provided under the Queensland Government “Flying Start” initiative, where Year 7 students were transitioned into high school starting in 2015.
Client: Department of Education QLD
Location: Merrimac, QLD
The building is designed to provide 11x flexible General Learning Areas (GLAs) and associated support and staff areas over two levels, raised above the adjoining sports field. A lower ground level, to the buildings full extent, provides undercover storage and recreational space. The long narrow building is orientated north-south with single GLAs designed to take full advantage of prevailing breezes, while screening elements protect its users from the Queensland sun. All rooms are connected to a generously-sized veranda which serves as the building’s main circulation and access route. A main entry forecourt at the ground level connects the building to the rest of the school and provides a gathering space where Year 7 students are welcomed into their first year
of high school.